Skip to main content

1.0

Minor Versionm

by REA

Introduction

Supplied Components:

QtyName
1Cast Acrylic Tube 3” 140mm
2O-Ring Flange 3”
13” End Cap Aluminium - 4 holes
13” End Cap Aluminium - No holes
1Peristaltic Pump
1M10 Cable Penetrator - 8mm Cable
1M10 Cable Penetrator - 6mm Cable
1M10 Cable Penetrator - Blank
1Enclosure Vent & Plug
1Bladder
2M3 Threaded Rod
4M3 Nut
1Silicone Hose
16mm Rigid HDPE Pipe

This guide outlines the parts that come in the kit that are required for the Ballast Tank Assembly. Find these parts and put them aside ready for the assembly guides for the Ballast Tank.

  1. 1 x 3" Cast Acrylic Tube 140mm is required for each of the Ballast Tank Assemblies
    • 1 x 3" Cast Acrylic Tube 140mm is required for each of the Ballast Tank Assemblies

  2. 2 x 3" O-Ring Flange's are required for each of the Ballast Tank Assemblies
    • 2 x 3" O-Ring Flange's are required for each of the Ballast Tank Assemblies

  3. 1 x 3” End Cap Aluminium - 4 holes is required for each of the Ballast Tank Assemblies
    • 1 x 3” End Cap Aluminium - 4 holes is required for each of the Ballast Tank Assemblies

  4. 1 x 3” End Cap Aluminium - No holes is required for each of the Ballast Tank Assemblies.
    • 1 x 3” End Cap Aluminium - No holes is required for each of the Ballast Tank Assemblies.

  5. 1 x Peristaltic Pump is required for each of the Ballast Tank Assemblies
    • 1 x Peristaltic Pump is required for each of the Ballast Tank Assemblies

  6. 1 x M10 Cable Penetrator - 8mm Cable is required for each of the Ballast Tank Assemblies
    • 1 x M10 Cable Penetrator - 8mm Cable is required for each of the Ballast Tank Assemblies

  7. 1 x M10 Cable Penetrator - 6mm Cable is required for each of the Ballast Tank Assemblies.
    • 1 x M10 Cable Penetrator - 6mm Cable is required for each of the Ballast Tank Assemblies.

  8. 1 x M10 Cable Penetrator - Blank is required for each of the Ballast Tank Assemblies.
    • 1 x M10 Cable Penetrator - Blank is required for each of the Ballast Tank Assemblies.

  9. 1 x Enclosure Vent & Plug is required for each of the Ballast Tank Assemblies.
    • 1 x Enclosure Vent & Plug is required for each of the Ballast Tank Assemblies.

  10. 1 x Bladder is required for each of the Ballast Tank Assemblies.
    • 1 x Bladder is required for each of the Ballast Tank Assemblies.

  11. 2 x M3 Threaded Rod is required for each of the Ballast Tank Assemblies.
    • 2 x M3 Threaded Rod is required for each of the Ballast Tank Assemblies.

  12. 4 x M3 Nut is required for each of the Ballast Tank Assemblies.
    • 4 x M3 Nut is required for each of the Ballast Tank Assemblies.

  13. 1 x 1/4" LDPE Tubing is required for each of the Ballast Tank Assemblies.
    • 1 x 1/4" LDPE Tubing is required for each of the Ballast Tank Assemblies.

Finish Line

REA

Member since: 07/20/2020

7,051 Reputation

41 Guides authored

0 Comments

Add Comment

View Statistics:

Past 24 Hours: 0

Past 7 Days: 0

Past 30 Days: 4

All Time: 394